Current Transformer Connections
For capacity above 76Amps per phase, a Current Transformer (CT) Connection is needed to convert high voltage to low.
Connections for capacity from 76Amps to 152Amps will have a Jemena CT meter. 153Amps and over will have an external meter.
Note
CT Connection requests may require a Negotiated Connection to make the electricity supply available at the required capacity.
Frequently Asked Questions
How to apply
Who can submit the application?
What do I need to start the application?
What documents do I need to provide?
How much does it cost?
How long will it take?