The EGP is a key natural gas supply artery between gas fields in Gippsland in Victoria and the major gas markets in NSW and the ACT.
Gas transported on the EGP can be reliably delivered to:
The EGP is the only STTM facility operator in the Sydney STTM, with multiple independent delivery points providing increased security of supply for customers. This gives EGP customers the flexibility to redirect gas to a number of markets across the East Coast of Australia, and thus the ability to increase utilisation of their services and maximise their value.
Jemena is proposing to duplicate the existing Port Kembla lateral pipeline, which forms part of the EGP. We recently submitted a Modification Report to the Department of Planning, Industry and Environment (DPIE). The modification is required to increase capacity to the EGP, to accommodate daily gas injection and maximum gas flows for the Port Kembla Gas Terminal Project, a separate project to be developed by Australian Industrial Energy (AIE). Jemena's application for the modification has now recieved formal approval from DPIE. The approval can also be viewed via the DPIE Planning Portal (https://www.planningportal.nsw.gov.au/major-projects/project/26196)
Jemena is committed to the provision of voluntary, non-discriminatory, pipeline access to third parties. We operate within a framework that takes into account sound commercial principles, and provides a fair and reasonable foundation to meet shippers’ needs. Jemena believes that such a commitment is essential to the development of transparent and competitive markets for pipeline services.
EGP Commercial Information |
|
---|---|
Standard Terms & Conditions | Click here for EGP Standard Terms & Conditions |
EGP Tariff Schedule | Click here for EGP Tariff Schedule |
Transportation Services | Click here for EGP Transportation Services and Pricing Methodology |
Operational Transportation |
Click here for EGP OTSA version 2 Click here for EGP OTSA version 1 (superseded) |
Jemena Information about Operational Transportation Service Agreements | Click here for Jemena Information about Operational Transportation Service Agreements |
Standardisation Cost |
Click here for Standardisation Cost Charge Information |
We look forward to discussing your gas transportation requirements.
The EGP compresses all gas transported on the TGP at the TGP interconnection point. Shippers injecting into the TGP interconnection point require a standard EGP transportation agreement, available upon referral from the Tasmanian Gas Pipeline. Click here for the EGP - TGP Transfer Services Standard Terms & Conditions.
To discuss your gas transportation needs, please contact Courtney Fabian, Commercial Manager – Victoria, NSW & Northern Territory on (03) 9173 8006 or pipelines.commercial@jemena.com.au.
EGP Summary |
|
---|---|
Pipeline Class | Transmission |
EGP Schematic Map | Click here for EGP Schematic map |
Length |
796.69 km* (*or 822.42km including laterals) |
Nameplate Capacity |
EGP services:
TGP Transfer services:
|
Receipt Points | GBJV Longford, Orbost (Patricia Baleen), VicHub |
Area 1 Delivery Points | Bairnsdale (Lateral) - City Gate, Bairnsdale (Lateral) - Power Station |
Area 2 Delivery Points | Bombala, Cooma, Hoskinstown (ACT), Nowra |
Area 3 Delivery Points | Horsley Park (STTM), Wilton JGN (STTM), Port Kembla (STTM), Albion Park (STTM), Wilton MSP, Yallah(Tallawarra), Smithfield,Bomaderry |
Other Delivery Points | TGP Delivery Point, VicHub Delivery Point |
Detailed Facility Information | Click here for EGP Detailed Facility Information and also via the Gas Market Bulletin Board. |
Planned Maintenance Schedule | Click here for AEMO Gas Bulletin Board Medium Term Capacity Outlook (Future) |
Available Capacity |
Click here for the EGP available capacity outlook via the AEMO Gas Bulletin Board Uncontracted Capacity Outlook (Future) *Firm Forward. Actual available capacity will vary depending on specific Receipt and Delivery Point requirements. |
Historical Gas Flows |
Click here for EGP Usage and Scheduled Flow and also via the Gas Market Bulletin Board |
Operations Manual | Click here for EGP Operations Manual |
Measurement Manual | Click here for EGP Measurement Manual |
Gas Day Harmonisation | Click here for the Jemena GDH Transition Plan |
EGP Non-Discriminatory Access Policy | Click here for EGP Non-Discriminatory Access Policy |
Technical and Physical Characteristics |
|
Pressure | Between 3,000 kPa gauge and 16,550 kPa gauge |
Compression |
4 Solar Taurus turbine and compressor units at the Longford inlet |
Gas Specification | Click here for EGP Gas Specification |
Financial Information |
|
Financial Reporting Template |
Financial reporting template for the EGP is available:
|
Basis of Preparation |
The basis of preparation used to prepare the financial reporting template for the EGP are available:
|
Review and Audit report |
The review report providing assurance to Jemena over the financial reporting template for the EGP are available:
The audit report providing assurance to Jemena over the financial reporting template for the EGP is available:
|
Pursuant to Rule 558 of the National Gas Rules, the User Access Guide can be found here.
The information contained in these pages is current as at the date of publication and will remain current for the foreseeable future, or until the stated date where noted next to information that requires periodic update.