The Darling Downs Pipeline (DDP) plays an important part in delivering Jemena’s Northern Growth Strategy which seeks to build an interconnected supply chain of energy delivery assets in northern Australia through targeted acquisitions and greenfield developments.

The DDP consists of three interconnected gas transmission pipeline licences in the Darling Downs region in South-East Queensland that operate as a single pipeline network. It links the Wallumbilla gas hub near Roma with the Talinga gas plant near Chinchilla and Origin’s Darling Downs gas fired power station near Dalby in Queensland.

The DDP spans 292km in length and transports gas from the Bowen-Surat basin to the Wallumbilla gas hub, Origin’s 630MW Darling Downs Power Station and to APLNG’s export pipeline.

Gas transported on the DDP is currently delivered to:

  • Brisbane via the Roma Brisbane Pipeline at Wallumbilla (Run 7)
  • Gladstone via the GLNG Pipeline at Wallumbilla (Santos WCS) or via the APLNG Pipeline at Talinga
  • South West Queensland Pipeline at Wallumbilla (Run 6 and Run 9), for delivery to southern markets
  • Darling Downs Power Station at the eastern end of the DDP

Jemena is committed to the provision of voluntary, non-discriminatory, pipeline access to third parties. We operate within a framework that takes into account sound commercial principles, and provides a fair and reasonable foundation to meet shippers’ needs.  Jemena believes that such a commitment is essential to the development of transparent and competitive markets for pipeline services.

Jemena does not currently have a standard service offering available on the DDP. As a responsible service provider, we are taking time to understand and develop the capabilities of the pipeline to service new users while ensuring a reliable service to existing users. We do, however, encourage prospective new users to contact us to discuss how DDP can play a role in servicing their gas transportation needs.

Available Capacity

DDP Commercial Information      
Standard Terms & Conditions Click here for DDP Standard Terms & Conditions
DDP Tariff Schedule Click here for DDP Tariff Schedule
Transportation Services Click here for DDP Transportation Services and Pricing Methodology
Operational Transportation
Service Agreement

Click here for DDP OTSA version 2

Click here for DDP OTSA redline version
(version 1 dated 22 January 2019 vs version 2 dated 30 April 2020)

Click here for DDP OTSA version 1 (superseded)

Jemena Information about Operational Transportation Service Agreements Click here for Jemena Information about Operational Transportation Service Agreements
Standardisation Cost Charge
Information
Click here for Standardisation Cost Charge Information

We look forward to discussing your gas transportation requirements.  

Contact Us

To discuss your gas transportation needs, please contact Stephen Coghlan, Commercial Manager, Queensland Assets on (03) 9173 7376 or pipelines.commercial@jemena.com.au.

DDP Summary
Pipeline Class Transmission
DDP Schematic Map Click here for DDP Schematic map
Length

292km*

(*or 293.15 km including laterals)

Nameplate Capacity DDP90: Southern Haul: 155 TJ/d
DDP133: Western Haul: 502 TJ/d
DDP133: Eastern Haul: 160 TJ/d
DDP134: Western Haul: 365 TJ/d
DDP134: Eastern Haul: 268 TJ/d
Receipt Points Taloona, Spring Gully Manifold, Talinga, Kenya, Ruby, Orana, Atlas Lateral
Delivery Points

Talinga

Wallumbilla Hub: SWQP (Run 6, Run 9), Santos WCS, RBP (Run 7)

Darling Downs Power Station 

Detailed Facility Information Click here for DDP Detailed Facility Information
Planned Maintenance Schedule Click here for AEMO Gas Bulletin Board Medium Term Capacity Outlook (Future) 
Available Capacity

Click here for the DDP available capacity outlook via the AEMO Gas Bulletin Board Uncontracted Capacity Outlook (Future)

*Firm Haulage. There is firm capacity available at certain locations, but actual available capacity will vary depending on specific Receipt and Delivery Point requirements.

Historical Gas Flows

Click here for DDP Usage and Scheduled Flow and also via the Gas Market Bulletin Board

Technical and Physical Characteristics
Pressure Between 10,200 kPa gauge and 15,300 kPa gauge
Gas Specification Click here for DDP Gas Specification
Measurement Manual Click here for DDP Measurement Manual
Gas Day Harmonisation Click here for the Jemena GDH Transition Plan
Financial Information
Financial Reporting Template

Financial reporting template for the DDP is available:

  • here for the six months from 1 January to 30 June 2018
  • here for the twelve months from 1 January to 31 December 2018
  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022

Note: The Financial Reporting Template and Basis of Preparation for the twelve month period from 1 January 2019 to 31 December 2019 has been restated on 30 November 2020 to remove the Atlas gas production infrastructure and lateral (Atlas) financial transactions from 2018 & 2019.  Atlas was determined to be a separate facility from the Darling Downs Pipeline subsequent to the original publication.  The 2018 Darling Downs Pipeline Financial Reporting Templates and Basis of Preparation has not been restated, refer to the 2019 restatement for details of the changes impacting 2018.

Basis of Preparation

The basis of preparation used to prepare the financial reporting template for the DDP are available

  • here for the six months from 1 January to 30 June 2018
  • here for the twelve months from 1 January to 31 December 2018
  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022
Review and Audit Report

The review report providing assurance to Jemena over the financial reporting template for the DDP are available:

  • here for the six months from 1 January to 30 June 2018
  • here for the twelve months from 1 January to 31 December 2018
  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022

The audit report providing assurance to Jemena over the financial reporting template for the DDP is available:

  • here for the twelve months from 1 January to 31 December 2018
  • here for the twelve months from 1 January to 31 December 2019
  • here for the twelve months from 1 January to 31 December 2020
  • here for the twelve months from 1 January to 31 December 2021
  • here for the twelve months from 1 January to 31 December 2022

Pursuant to Rule 558 of the National Gas Rules, the User Access Guide can be found here.

The information contained in these pages is current as at the date of publication and will remain current for the foreseeable future, or until the stated date where noted next to information that requires periodic update.